Share:

RTE 244 over GENESEE RIVER

Map

Coordinates:
+42.22693, -78.03421
42°13'37" N, 78°02'03" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:RTE 244 over GENESEE RIVER
Structure number:000000001042860
Location:JCT RTE 244 & GENESEE RIV
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:127.0 ft. [38.7 m]
Total length:259.9 ft. [79.2 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:40.0 ft. [12.2 m]
Owner:State Highway Agency [01]
Year built:1997
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:2
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

Latest Available Inspection: May 2015

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:1,464 [as of 2013]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:90.9 tons [82.6 metric tons]
Inventory rating:53.9 tons [49.0 metric tons]
Sufficiency rating:74.7
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$2,540,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
May 201574.7FairSatisfactoryGoodFair-1464
April 201374.7FairSatisfactoryGoodFair-1464
May 201174.0FairGoodGoodFair-1640
May 200970.5FairGoodGoodFair-2233
June 200782.8GoodGoodGoodVery Good-2250
June 200585.5GoodGoodGoodVery Good-1749
June 200385.5GoodGoodGoodVery Good-1749
August 200184.6GoodGoodVery GoodVery Good-1719
October 199981.2GoodGoodVery GoodVery Good-2393
November 199785.0GoodVery GoodVery GoodGood-1915
September 199630.9PoorSeriousPoorPoorSD1915
July 199544.5PoorSeriousPoorPoorSD1915
October 199444.5PoorSeriousPoorPoorSD1915
August 199343.3PoorSeriousPoorPoorSD7528
June 199146.3PoorPoorPoorPoorSD2805