KING ROAD over BUTTERMILK CREEK

Map

Coordinates:
+42.41015, -76.51404
42°24'37" N, 76°30'51" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:KING ROAD over BUTTERMILK CREEK
Structure number:000000001050270
Location:AT BUTTERMILK FALLS
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:65.9 ft. [20.1 m]
Total length:69.9 ft. [21.3 m]
Roadway width between curbs:26.6 ft. [8.1 m]
Deck width edge-to-edge:30.8 ft. [9.4 m]
Owner:County Highway Agency [02]
Year built:1929
Year reconstructed:1999
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Masonry [8]
Main span design:Arch - Deck [11]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

Latest Available Inspection: July 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:943 [as of 2016]
Truck traffic:3% of total traffic
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:55.5
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$1,455,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
July 2017Fair-SatisfactoryFair94355.5
June 2015Fair-SatisfactoryFair108154.4
June 2013Fair-SatisfactorySatisfactory108164.5
July 2011Fair-SatisfactorySatisfactory108064.5
July 2009Fair-SatisfactorySatisfactory80565.5
June 2007Fair-GoodSatisfactory80565.5
June 2005Good-GoodGood80566.5
June 2003Good-Very GoodGood80566.5
August 2001Good-Very GoodGood80567.5
July 1999Good-Very GoodGood64074.6
June 1997FairFairGoodFair55064.6
July 1995Poor-FairPoor55050.3
August 1993Poor-FairPoor55050.3
July 1991Poor-FairPoor55056.9

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Masonry Archlinear ft.70403000
Substructure
Masonry Abutmentlinear ft.6206200
Reinforced Concrete Pile Cap/Footinglinear ft.31016150
Bridge Rail
Masonry Bridge Raillinear ft.140140000