Share:

ROCKY HILL ROAD over RTE I295, RTE I295

Map

Coordinates:
+40.75326, -73.77588
40°45'12" N, 73°46'33" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:ROCKY HILL ROAD over RTE I295, RTE I295
Structure number:000000001055500
Location:2.6 MI S JCT I78 & I495
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Collector (Urban) [17]
Length of largest span:56.8 ft. [17.3 m]
Total length:119.1 ft. [36.3 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:61.7 ft. [18.8 m]
Vertical clearance below bridge:13.1 ft. [4.0 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1961
Year reconstructed:1993
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: May 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:7,577 [as of 2015]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Scour condition:Bridge not over waterway. [N]
Sufficiency rating:74.5
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$3,141,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2016FairGoodGoodSatisfactory757774.5
May 2015FairGoodSatisfactorySatisfactory832474.5
January 2014FairGoodSatisfactorySatisfactory845774.5
August 2013FairGoodFairSatisfactory845763.3
January 2012FairGoodFairSatisfactory845763.3
January 2010FairGoodGoodSatisfactory845774.5
January 2008GoodGoodGoodGood909474.4
January 2006GoodGoodGoodGood845774.5
January 2004GoodGoodGoodGood845774.5
January 2002GoodGoodGoodGood845773.5
January 2000FairSatisfactorySatisfactoryFair709162.4
January 1998FairSatisfactorySatisfactoryFair709162.4
January 1996PoorFairFairPoor913346.9
January 1994PoorFairFairPoor1200046.8
January 1992PoorFairFairSerious1200027.5
February 1990PoorFairFairPoor1200046.8

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Steel Girder/Beamlinear ft.952095200
Steel Protective Coatingsq. ft.7,7987,40839000
Deck
Reinforced Concrete Decksq. ft.7,42007,397230
Wearing Surfacessq. ft.4,80004,80000
Substructure
Reinforced Concrete Columneach40220
Reinforced Concrete Abutmentlinear ft.122090320
Reinforced Concrete Pier Caplinear ft.58036220
Joints
Compression Jointlinear ft.1860156300
Bearings
Elastomeric Bearingeach1601600
Steel Protective Coatingsq. ft.1601600
Fixed Bearingeach1601600
Steel Protective Coatingsq. ft.1601600
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.240024000
Steel Protective Coatingsq. ft.1,2801,2166400