Share:

ARTHUR AVENUE over RTE I95, RTE 95I

Map

Coordinates:
+40.84363, -73.89487
40°50'37" N, 73°53'42" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:ARTHUR AVENUE over RTE I95, RTE 95I
Structure number:000000001066350
Location:1.7 MI E JCT I87 & I95
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Local (Urban) [19]
Length of largest span:91.9 ft. [28.0 m]
Total length:100.1 ft. [30.5 m]
Roadway width between curbs:57.1 ft. [17.4 m]
Deck width edge-to-edge:153.9 ft. [46.9 m]
Vertical clearance below bridge:13.1 ft. [4.0 m]
Skew angle:33°
Owner:State Highway Agency [01]
Year built:1958
Year reconstructed:1975
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Concrete [1]
Main span design:Frame [07]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

Latest Available Inspection: June 2017

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:4,717 [as of 2010]
Truck traffic:7% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Superior to present desirable criteria [9]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Scour condition:Bridge not over waterway. [N]
Sufficiency rating:62.6
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$16,037,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
June 2017PoorPoorPoorSatisfactory471762.6
May 2016PoorPoorPoorSatisfactory482862.6
May 2015PoorPoorPoorSatisfactory482847.6
April 2014PoorPoorPoorSatisfactory382062.7
March 2012PoorPoorPoorSatisfactory382062.7
May 2010PoorPoorPoorSatisfactory382062.7
April 2008PoorPoorPoorSatisfactory382062.7
May 2006Poor-PoorSatisfactory382065.7
May 2004Poor-PoorSatisfactory382065.7
July 2002Poor-PoorSatisfactory293665.8
June 2000PoorPoorPoorSatisfactory293662.8
June 1998PoorPoorPoorSatisfactory293649.7
February 1996Poor-PoorFair293649.2
March 1994Poor-PoorFair160049.6
March 1992Poor-PoorFair160063.6
March 1990Poor-PoorSatisfactory160049.6

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Reinforced Concrete Abutmentlinear ft.306306000
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.375375000
Steel Protective Coatingsq. ft.2,6361,31801,3180
Deck
Reinforced Concrete Slabsq. ft.14,4383,00011,04860330
Wearing Surfacessq. ft.6,4005,1201,28000