Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:CROTONA AVENUE over RTE I95, RTE 95I
Structure number:000000001066360
Location:1.8 MI E I87+I95
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:114.8 ft. [35.0 m]
Total length:120.1 ft. [36.6 m]
Roadway width between curbs:54.1 ft. [16.5 m]
Deck width edge-to-edge:83.3 ft. [25.4 m]
Vertical clearance below bridge:19.7 ft. [6.0 m]
Skew angle:28°
Owner:State Highway Agency [01]
Year built:1958
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Concrete [1]
Main span design:Arch - Deck [11]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

Latest Available Inspection: March 2016

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:13,446 [as of 2016]
Truck traffic:7% of total traffic
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Scour condition:Bridge not over waterway. [N]
Sufficiency rating:48.6
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$37,324,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
March 2016Poor-PoorSatisfactory1344648.6
April 2014Poor-PoorFair914849.0
March 2012Poor-PoorFair910049.0
May 2010Poor-PoorFair858749.1
April 2008Poor-PoorFair858749.1
June 2006Poor-PoorFair858749.1
July 2004Poor-PoorFair858749.1
September 2003Poor-PoorFair858749.1
July 2002Poor-PoorFair858749.1
August 2001Poor-PoorFair858749.1
August 2000Poor-PoorFair773049.2
July 1999Poor-PoorFair773034.6
June 1998Poor-PoorFair773034.6
July 1997PoorPoorPoorFair773031.3
March 1996Poor-PoorPoor773032.9
April 1995Poor-PoorPoor170042.1
March 1994Poor-PoorPoor170042.1
March 1992Poor-PoorPoor170042.1
March 1990Poor-PoorPoor170042.1

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Reinforced Concrete Archlinear ft.1151201030
Substructure
Reinforced Concrete Pile Cap/Footinglinear ft.160160000
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.460460000
Steel Protective Coatingsq. ft.1,8851,73515000