MARMION AVE over RTE I95, RTE I95

Map

Coordinates:
+40.84164, -73.88836
40°50'30" N, 73°53'18" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:MARMION AVE over RTE I95, RTE I95
Structure number:000000001066380
Location:2.0 MI E I87 + I95
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Local (Urban) [19]
Length of largest span:53.8 ft. [16.4 m]
Total length:112.9 ft. [34.4 m]
Roadway width between curbs:34.1 ft. [10.4 m]
Deck width edge-to-edge:63.3 ft. [19.3 m]
Vertical clearance below bridge:19.7 ft. [6.0 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1958
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Frame [07]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

Latest Available Inspection: March 2016

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Truck traffic:4% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Meets minimum tolerable limits to be left in place as is [4]
Scour condition:Bridge not over waterway. [N]
Sufficiency rating:61.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$52,424,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
March 2016PoorPoorPoorSatisfactory-61.0
March 2014Poor-PoorSatisfactory205263.8
March 2012Poor-PoorSatisfactory205263.8
April 2010Poor-PoorSatisfactory205263.8
April 2008Poor-PoorSatisfactory205263.8
April 2006Poor-PoorSatisfactory205263.8
March 2004Poor-PoorSatisfactory205263.8
April 2002Poor-PoorSatisfactory134763.9
March 2000PoorFairPoorSatisfactory134762.9
June 1998Fair-FairSatisfactory134763.9
April 1996Poor-PoorFair134749.6
May 1994Poor-PoorFair100049.7
July 1992Poor-PoorFair100049.7
March 1990Poor-PoorFair100048.7

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Reinforced Concrete Pier Walllinear ft.6363000
Reinforced Concrete Abutmentlinear ft.126126000
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.416416000
Steel Protective Coatingsq. ft.1,52601,450076
Deck
Reinforced Concrete Slabsq. ft.6,56001,9654,5950