Share:

RTE I95 over RTE 908A, 908X908AX1M120

Map 

Coordinates:
+40.82825, -73.84115
40°49'42" N, 73°50'28" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:RTE I95 over RTE 908A, 908X908AX1M120
Structure number:00000000106653A
Location:JCT I95 & I878 & I78
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:174.9 ft. [53.3 m]
Total length:1501.1 ft. [457.5 m]
Roadway width between curbs:34.8 ft. [10.6 m]
Deck width edge-to-edge:50.5 ft. [15.4 m]
Vertical clearance above deck:16.4 ft. [5.0 m]
Vertical clearance below bridge:16.7 ft. [5.1 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1971
Year reconstructed:2002
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:11
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

Latest Available Inspection: July 2016 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:102,655 [as of 2010]
Truck traffic:9% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Meets minimum tolerable limits to be left in place as is [4]
Scour condition:Bridge not over waterway. [N]
Operating rating:103.7 tons [94.3 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:91.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$11,635,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
July 201691.0FairSatisfactoryGoodGoodFO102655
July 201491.0FairSatisfactoryGoodGoodFO70000
July 201291.0GoodGoodGoodGoodFO70000
August 201091.0GoodGoodGoodGood-70000
July 200891.0GoodGoodGoodGood-70000
July 200691.0GoodGoodGoodGoodFO70000
September 200491.0GoodVery GoodGoodGoodFO70000
September 200289.7GoodVery GoodGoodGoodFO70000
August 200079.0FairFairFairSatisfactoryFO70000
May 199875.1FairFairFairSatisfactoryFO70000
October 199660.7PoorPoorPoorPoorSD70000
August 199455.9PoorPoorPoorPoorSD70000
August 199255.9PoorPoorPoorPoorSD70000
August 199055.9PoorPoorPoorPoorSD70000