Share:

N ALBANY CRESCENT over RTE I87

Map

Coordinates:
+40.87892, -73.90324
40°52'44" N, 73°54'12" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:N ALBANY CRESCENT over RTE I87
Structure number:00000000106697A
Location:2.6 MI N JCT I87 & I95
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Local (Urban) [19]
Length of largest span:29.9 ft. [9.1 m]
Total length:353.0 ft. [107.6 m]
Roadway width between curbs:33.1 ft. [10.1 m]
Deck width edge-to-edge:59.7 ft. [18.2 m]
Vertical clearance below bridge:13.1 ft. [4.0 m]
Skew angle:40°
Owner:State Highway Agency [01]
Year built:1955
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:13
Main spans material:Steel [3]
Main spans design:Girder and floorbeam system [03]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: January 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:2,032 [as of 2015]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Meets minimum tolerable limits to be left in place as is [4]
Scour condition:Bridge not over waterway. [N]
Sufficiency rating:78.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$18,098,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
January 2016FairFairFairFair203278.0
January 2014FairFairFairFair169377.7
February 2012FairFairSatisfactorySatisfactory169388.7
February 2010FairFairSatisfactorySatisfactory169388.7
February 2008FairSatisfactorySatisfactorySatisfactory169389.7
March 2006FairSatisfactorySatisfactorySatisfactory169389.7
March 2004FairSatisfactorySatisfactorySatisfactory169389.7
March 2002FairSatisfactorySatisfactorySatisfactory169389.7
May 2000FairSatisfactorySatisfactorySatisfactory169389.7
June 1998FairSatisfactorySatisfactoryFair169380.0
July 1996PoorPoorFairPoor169361.0
June 1995PoorPoorFairPoor90047.0
June 1994PoorPoorPoorPoor90044.8
June 1993PoorPoorPoorPoor90044.8
October 1992PoorPoorPoorPoor90044.8
September 1991PoorPoorPoorPoor90044.8