Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:RTE 907H over BRONX RIVER
Structure number:000000001075059
Location:4.5 MI N I95 + BX RVR PKW
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:66.9 ft. [20.4 m]
Total length:79.1 ft. [24.1 m]
Roadway width between curbs:69.9 ft. [21.3 m]
Deck width edge-to-edge:98.4 ft. [30.0 m]
Vertical clearance below bridge:29.5 ft. [9.0 m]
Skew angle:20°
Owner:State Highway Agency [01]
Year built:1951
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 18 / H 20 [4]
Main span material:Concrete [1]
Main span design:Arch - Deck [11]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

Latest Available Inspection: January 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:82,794 [as of 2013]
Truck traffic:5% of total traffic
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:68.8
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$19,121,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
January 2016Fair-SatisfactorySatisfactory8279468.8
January 2014Fair-SatisfactorySatisfactory8272568.8
January 2012Fair-SatisfactorySatisfactory8270068.8
January 2010Fair-SatisfactorySatisfactory8154368.8
January 2008Fair-SatisfactorySatisfactory8154368.8
February 2006Fair-SatisfactorySatisfactory8154368.8
February 2004Fair-SatisfactorySatisfactory8154368.8
April 2002Fair-SatisfactorySatisfactory6749267.0
September 2000Fair-SatisfactorySatisfactory6749267.0
June 1998Fair-SatisfactorySatisfactory5950567.0
April 1996Fair-FairFair6967873.9
April 1994Fair-FairFair7184873.9
February 1992Fair-FairFair7184874.9
May 1990Fair-FairFair8736082.1