Share:

HOXIE GORGE ROAD over HOXIE GORGE CREEK

Map 

Coordinates:
+42.54702, -76.09359
42°32'49" N, 76°05'37" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:HOXIE GORGE ROAD over HOXIE GORGE CREEK
Structure number:000000002207220
Location:3.5 MI S OF MCGRAW
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:18.7 ft. [5.7 m]
Total length:42.0 ft. [12.8 m]
Roadway width between curbs:21.7 ft. [6.6 m]
Deck width edge-to-edge:24.9 ft. [7.6 m]
Owner:Town or Township Highway Agency [03]
Year built:1940
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

Latest Available Inspection: May 2015 

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:296 [as of 2011]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Critical [2 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Bridge is scour critical; field review indicates that extensive scour has occurred at bridge foundations. [2]
Operating rating:80.9 tons [73.5 metric tons]
Inventory rating:32.3 tons [29.4 metric tons]
Sufficiency rating:14.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$525,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
May 201514.3PoorFairFairCriticalSD296
May 201349.7PoorSatisfactoryFairPoorSD296
May 201149.7PoorSatisfactoryFairPoorSD300
June 200954.4PoorSatisfactoryFairPoorSD221
June 200754.4PoorSatisfactoryFairPoorSD221
June 200570.5FairSatisfactoryFairFair-221
June 200371.5FairSatisfactoryFairSatisfactory-221
May 200173.3FairSatisfactoryFairSatisfactory-221
April 199973.3FairSatisfactoryFairSatisfactory-196
April 199771.2Fair-FairSatisfactory-196
April 199549.2Poor-PoorFairSD300
April 199349.2Poor-PoorFairSD300
April 199145.2Poor-PoorPoorSD300