SHORE ROAD over HUTCHINSON RIVER

Map

Coordinates:
+40.86312, -73.81502
40°51'47" N, 73°48'54" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:SHORE ROAD over HUTCHINSON RIVER
Structure number:000000002240200
Location:OVER HUTCHINSON RIVER
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:125.0 ft. [38.1 m]
Total length:842.9 ft. [256.9 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:51.8 ft. [15.8 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Owner:City or Municipal Highway Agency [04]
Year built:1906
Year reconstructed:1981
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Steel [3]
Main span design:Movable - Bascule [16]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

Latest Available Inspection: July 2017

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:16,336 [as of 2016]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Basically intolerable requiring high priority of corrrective action [3]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Meets minimum tolerable limits to be left in place as is [4]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:In place but in a deteriorated condition [3]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:71.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$84,215,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
July 2017PoorGoodPoorFair1633671.0
June 2016PoorGoodPoorFair1644730.7
June 2015PoorGoodPoorFair225197.1
May 2014PoorGoodPoorFair225197.1
June 2013PoorGoodPoorFair227817.1
June 2012PoorGoodPoorFair225007.1
June 2011PoorGoodPoorFair225007.1
June 2010PoorGoodPoorFair192547.1
July 2008PoorGoodPoorFair192546.1
July 2006PoorGoodPoorFair188086.1
September 2004PoorVery GoodPoorFair92716.1
November 2002PoorVery GoodPoorFair168155.6
October 2000PoorFairPoorSatisfactory201584.5
November 1998FairFairFairSatisfactory1818419.7
October 1997PoorFairPoorPoor162504.5
September 1996PoorPoorPoorPoor266473.3
August 1995PoorPoorPoorPoor1533315.9
December 1994PoorPoorSeriousPoor148622.0
August 1993PoorPoorSeriousPoor148622.0
October 1992PoorPoorPoorPoor1486215.9
August 1990PoorPoorPoorPoor148623.4

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Steel Stringerlinear ft.1,64301,6131515
Steel Protective Coatingsq. ft.6,92105,5001,38536
Steel Trusslinear ft.41103782013
Steel Protective Coatingsq. ft.2,97802,05389035
Reinforced Concrete Archlinear ft.71805491690
Steel Floor Beamlinear ft.4320420102
Steel Protective Coatingsq. ft.1,93001,38253018
Steel Gusset Plateeach128085385
Steel Protective Coatingsq. ft.128001235
Substructure
Reinforced Concrete Pier Walllinear ft.3840300840
Reinforced Concrete Abutmentlinear ft.144014400
Reinforced Concrete Pile Cap/Footinglinear ft.3880304840
Deck
Open Grid Decksq. ft.4,8003,2001,60000
Steel Protective Coatingsq. ft.2,4001,0001,40000
Joints
Open Jointlinear ft.144488880
Bearings
Fixed Bearingeach1201200
Steel Protective Coatingsq. ft.2802800
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.206020600
Steel Protective Coatingsq. ft.822082200
Reinforced Concrete Bridge Raillinear ft.1,43601,386500