NINTH STREET over NYCTA F LINE, GOWANUS CA

Map

Coordinates:
+40.67419, -73.99664
40°40'27" N, 73°59'48" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:NINTH STREET over NYCTA F LINE, GOWANUS CA
Structure number:000000002240240
Location:OVER GOWANUS CANAL
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:81.7 ft. [24.9 m]
Total length:109.9 ft. [33.5 m]
Roadway width between curbs:35.1 ft. [10.7 m]
Deck width edge-to-edge:51.8 ft. [15.8 m]
Vertical clearance above deck:17.1 ft. [5.2 m]
Vertical clearance below bridge:59.7 ft. [18.2 m]
Owner:City or Municipal Highway Agency [04]
Year built:1903
Year reconstructed:1999
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Main span material:Steel [3]
Main span design:Movable - Lift [15]
Deck type:Not applicable [N]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: June 2015

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:11,814 [as of 2014]
Truck traffic:7% of total traffic
Deck condition:Excellent [9 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:87.8 tons [79.8 metric tons]
Inventory rating:51.9 tons [47.2 metric tons]
Sufficiency rating:72.9
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$100,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
June 201572.9GoodExcellentExcellentGoodFO11814
June 201373.6GoodExcellentExcellentGoodFO7518
May 201173.6GoodExcellentExcellentGoodFO7518
June 200973.2GoodExcellentExcellentGoodFO10145
June 200773.0GoodExcellentExcellentGood-11311
June 200573.6GoodExcellentExcellentGood-7518
July 200373.6GoodExcellentExcellentExcellent-7518
June 200173.7GoodExcellentExcellentExcellent-6989
November 199973.4GoodExcellentExcellentExcellent-8898
March 199927.9PoorPoorPoorPoorSD8898
May 199827.9PoorPoorPoorPoorSD8898
March 199727.7PoorPoorPoorPoorSD8898
April 199627.3PoorPoorPoorPoorSD8898
September 199324.8PoorPoorPoorPoorSD12578
June 199224.8PoorPoorPoorPoorSD12578
July 199135.8PoorPoorPoorPoorSD12578