Share:

CROPSEY AVENUE SB over CONEY ISLAND CREE

Map 

Coordinates:
+40.58133, -73.98571
40°34'53" N, 73°59'09" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:CROPSEY AVENUE SB over CONEY ISLAND CREE
Structure number:000000002240301
Location:IN CONEY ISLAND
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:154.9 ft. [47.2 m]
Total length:204.7 ft. [62.4 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:45.6 ft. [13.9 m]
Vertical clearance below bridge:3280.7 ft. [999.9 m]
Owner:City or Municipal Highway Agency [04]
Year built:1930
Year reconstructed:1995
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Girder and floorbeam system [03]
Deck type:Closed Grating [4]
Wearing surface:Epoxy Overlay [5]

Latest Available Inspection: June 2015 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:15,684 [as of 2013]
Truck traffic:7% of total traffic
Deck condition:Excellent [9 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Pier/abutment protection:In place but in a deteriorated condition [3]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:84.5 tons [76.8 metric tons]
Inventory rating:32.3 tons [29.4 metric tons]
Sufficiency rating:61.7
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$4,560,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
June 201561.7FairExcellentFairSatisfactoryFO15684
July 201363.5FairExcellentFairSatisfactoryFO15684
June 201174.8FairVery GoodSatisfactorySatisfactoryFO17377
July 200974.7FairVery GoodSatisfactorySatisfactoryFO17549
October 200874.7FairVery GoodSatisfactorySatisfactoryFO17549
September 200775.1FairVery GoodSatisfactorySatisfactoryFO15515
August 200573.8FairVery GoodSatisfactorySatisfactoryFO17377
July 200373.8FairVery GoodSatisfactorySatisfactory-17377
June 200164.9FairFairSatisfactorySatisfactory-31999
October 199965.4FairFairSatisfactorySatisfactory-29616
October 199757.3FairVery GoodFairSatisfactory-16385
July 199546.4PoorVery GoodPoorPoor-16385
March 199519.7PoorSeriousSeriousFairSD16385
March 199419.7PoorSeriousSeriousFairSD16385
June 199219.7PoorSeriousSeriousFairSD16385
July 199119.7PoorSeriousSeriousFairSD16385