Share:

E.TREMONT AVENUE over BRONX RIVER

Map

Coordinates:
+40.83990, -73.87835
40°50'24" N, 73°52'42" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:E.TREMONT AVENUE over BRONX RIVER
Structure number:000000002242149
Location:OVER BRONX RIVER
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:42.0 ft. [12.8 m]
Total length:88.9 ft. [27.1 m]
Roadway width between curbs:100.1 ft. [30.5 m]
Deck width edge-to-edge:144.0 ft. [43.9 m]
Skew angle:25°
Owner:City or Municipal Highway Agency [04]
Year built:1897
Year reconstructed:1955
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: April 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:20,662 [as of 2007]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:36.0 tons [32.7 metric tons]
Inventory rating:22.0 tons [20.0 metric tons]
Sufficiency rating:69.8
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$7,262,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
April 201669.8FairFairSatisfactorySatisfactory-20662
May 201569.8FairFairSatisfactorySatisfactory-20662
May 201471.4FairFairSatisfactorySatisfactory-20662
May 201267.0FairFairSatisfactorySatisfactory-20700
June 201068.0FairFairSatisfactorySatisfactory-16193
May 200885.8FairFairSatisfactorySatisfactory-16193
May 200686.5FairFairSatisfactorySatisfactory-16193
May 200486.5FairFairSatisfactorySatisfactory-16193
May 200284.4FairFairSatisfactorySatisfactory-16193
April 200083.5FairFairSatisfactorySatisfactory-16193
April 199885.8FairFairSatisfactorySatisfactory-16193
April 199660.1PoorPoorFairPoorSD11900
May 199457.8PoorPoorFairPoorSD11900
May 199257.8PoorPoorFairPoorSD11900
May 199055.7PoorSeriousPoorPoorSD11900