Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:RTE I278 over RTE I278, BRKLYN PROMENA
Structure number:000000002268498
Location:ADJACENT TO FURMAN STREET
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:96.8 ft. [29.5 m]
Total length:3604.2 ft. [1098.5 m]
Roadway width between curbs:33.5 ft. [10.2 m]
Deck width edge-to-edge:37.1 ft. [11.3 m]
Vertical clearance above deck:13.8 ft. [4.2 m]
Vertical clearance below bridge:13.1 ft. [4.0 m]
Owner:City or Municipal Highway Agency [04]
Year built:1944
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:69
Main spans material:Concrete [1]
Main spans design:Frame [07]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

Latest Available Inspection: November 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:134,800 [as of 2011]
Truck traffic:9% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Scour condition:Bridge not over waterway. [N]
Sufficiency rating:59.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$792,800,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
November 2016FairFairFairSatisfactory13480059.0
November 2014FairFairFairSatisfactory6739559.0
December 2013FairFairFairSatisfactory6300559.0
November 2011FairFairFairSatisfactory6710059.0
July 2009FairFairFairSatisfactory7104459.0
August 2007FairFairFairSatisfactory20265059.0
August 2005FairFairFairSatisfactory20265063.0
July 2003FairFairFairSatisfactory20265061.2
June 2001Fair-FairSatisfactory19074558.0
September 1999FairFairFairSatisfactory18203959.0
July 1997Poor-SeriousFair16830016.0
April 1995Poor-SeriousPoor8097116.0
February 1993Poor-SeriousPoor16790016.0

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Deck
Reinforced Concrete Decksq. ft.3,5892,1551,0763580
Steel Protective Coatingsq. ft.1,62001,607130
Superstructure
Reinforced Concrete Archlinear ft.3,4871,9241,0994640
Substructure
Reinforced Concrete Pier Walllinear ft.4620424173
Reinforced Concrete Abutmentlinear ft.1800180
Joints
Assembly with Sealeach2,553002,5530
Bearings
Movable Bearingeach20020
Steel Protective Coatingsq. ft.80080
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.6606150
Reinforced Concrete Bridge Raillinear ft.180017190