Share:

EAST LINCOLN AVE over HUTCHINSON RIVER

Map

Coordinates:
+40.91623, -73.81137
40°54'58" N, 73°48'41" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:EAST LINCOLN AVE over HUTCHINSON RIVER
Structure number:000000003348300
Location:AT PELHAM
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:34.8 ft. [10.6 m]
Total length:40.0 ft. [12.2 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:71.9 ft. [21.9 m]
Skew angle:
Owner:County Highway Agency [02]
Year built:1931
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Concrete [1]
Main span design:Arch - Deck [11]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

Latest Available Inspection: July 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:15,548 [as of 2005]
Truck traffic:5% of total traffic
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Basically intolerable requiring high priority of corrrective action [3]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:48.8
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$2,183,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
July 2017Fair-SatisfactorySatisfactory1554848.8
July 2015Fair-SatisfactorySatisfactory1656568.4
July 2013Fair-SatisfactorySatisfactory1656568.3
July 2011Fair-SatisfactorySatisfactory1766168.0
June 2009Fair-SatisfactorySatisfactory1766168.0
July 2007Fair-SatisfactorySatisfactory1766168.0
August 2005Fair-SatisfactorySatisfactory1766168.0
October 2003Fair-SatisfactorySatisfactory1766168.0
September 2001Fair-SatisfactorySatisfactory1766168.6
November 1999Fair-SatisfactorySatisfactory1766168.6
October 1997Fair-SatisfactorySatisfactory1766168.6
December 1995Fair-FairFair500059.6
October 1993Fair-FairFair500059.6
July 1991Fair-FairFair500061.8

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Reinforced Concrete Archlinear ft.3600360
Substructure
Reinforced Concrete Abutmentlinear ft.1400130100
Bridge Rail
Masonry Bridge Raillinear ft.7070000