Facts 

Name:FROM HARLEM RV DR over TRIBORO BRIDGE, E125 ST
Structure number:00000000552120A
Location:MANHATTAN
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Tolls:Yes [1]
Length of largest span:61.7 ft. [18.8 m]
Total length:467.9 ft. [142.6 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:26.9 ft. [8.2 m]
Vertical clearance above deck:14.1 ft. [4.3 m]
Vertical clearance below bridge:22.0 ft. [6.7 m]
Owner:Local Toll Authority [32]
Year built:1956
Year reconstructed:2011
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:11
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: June 2016 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:7,153 [as of 2011]
Truck traffic:5% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Better than present minimum criteria [7]
Scour condition:Bridge not over waterway. [N]
Operating rating:72.8 tons [66.2 metric tons]
Inventory rating:45.9 tons [41.7 metric tons]
Sufficiency rating:73.1
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$490,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
June 201673.1FairVery GoodGoodFair-7153
June 201473.1FairVery GoodGoodFair-7153
June 201265.0FairVery GoodGoodFair-57639
June 201031.2PoorPoorFairFairSD57639
June 200829.4PoorPoorFairFairSD57639
June 200629.4PoorPoorFairFairSD57639
May 200429.4PoorPoorFairFairSD57639
May 200231.0PoorPoorSatisfactoryFairSD9500
May 200044.0FairFairGoodSatisfactoryFO9500
August 199844.0FairFairGoodSatisfactoryFO9500
September 199615.9PoorPoorPoorPoorSD9500
August 199415.9PoorPoorPoorPoorSD9500
September 199221.9PoorPoorPoorPoorSD9500
August 199029.1PoorPoorPoorPoorSD9500