CROSS BAY BR EXIT over JAMAICA BAY

Map 

Coordinates:
+40.58791, -73.81934
40°35'16" N, 73°49'10" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:CROSS BAY BR EXIT over JAMAICA BAY
Structure number:00000000552123E
Location:RAMP ATTACH TO 55123D SN3
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Tolls:Yes [1]
Length of largest span:129.9 ft. [39.6 m]
Total length:575.8 ft. [175.5 m]
Roadway width between curbs:22.0 ft. [6.7 m]
Deck width edge-to-edge:26.2 ft. [8.0 m]
Vertical clearance above deck:19.7 ft. [6.0 m]
Vertical clearance below bridge:42.0 ft. [12.8 m]
Skew angle:20°
Owner:Local Toll Authority [32]
Year built:1967
Year reconstructed:2011
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:6
Main spans material:Prestressed concrete [5]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: September 2015 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Operating rating:62.9 tons [57.2 metric tons]
Inventory rating:38.0 tons [34.5 metric tons]
Sufficiency rating:87.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$393,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
September 201587.0FairFairFairSatisfactory--
September 201382.8FairFairFairSatisfactory-2700
September 201182.8FairFairFairSatisfactoryFO2700
September 200983.8FairSatisfactorySatisfactoryFairFO2700
August 200783.8FairSatisfactorySatisfactoryFairFO2700
July 200583.8FairSatisfactorySatisfactoryFairFO2700
August 200383.8FairSatisfactorySatisfactoryFairFO2700
July 200183.8FairSatisfactorySatisfactoryFairFO2700
June 199983.8FairSatisfactorySatisfactoryFairFO2700
May 199780.7FairFairFairFairFO2700
October 199562.0PoorPoorPoorPoorSD2700
July 199462.0PoorPoorPoorPoorSD2700
June 199246.2PoorPoorPoorPoorSD2700
June 199046.2PoorPoorPoorPoorSD2700