Share:

RTE I95 over RTE 9A, HUDSON RIVER

Map

Coordinates:
+40.85175, -73.95199
40°51'06" N, 73°57'07" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:RTE I95 over RTE 9A, HUDSON RIVER
Structure number:000000005522507
Location:95I OVER HUDSON RIVER LL
Purpose:Carries highway over highway and waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Tolls:Yes [1]
Length of largest span:3500.2 ft. [1066.8 m]
Total length:4986.1 ft. [1519.7 m]
Roadway width between curbs:71.9 ft. [21.9 m]
Deck width edge-to-edge:104.0 ft. [31.7 m]
Vertical clearance above deck:14.4 ft. [4.4 m]
Vertical clearance below bridge:212.9 ft. [64.9 m]
Owner:Local Toll Authority [32]
Year built:1962
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Suspension [13]
Deck type:Closed Grating [4]
Wearing surface:Bituminous [6]

Latest Available Inspection: September 2015

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:268,692 [as of 2014]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:85.8 tons [78.0 metric tons]
Inventory rating:32.3 tons [29.4 metric tons]
Sufficiency rating:52.3
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$280,724,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
September 201552.3FairSatisfactoryFairFairFO268692
September 201352.2FairSatisfactoryFairFairFO297700
September 201163.2FairSatisfactorySatisfactorySatisfactoryFO297700
October 200963.2FairSatisfactorySatisfactorySatisfactoryFO285620
December 200763.2FairSatisfactorySatisfactorySatisfactoryFO297342
September 200563.2FairSatisfactorySatisfactorySatisfactoryFO297700
September 200362.2FairGoodSatisfactoryGoodFO297700
November 200166.0FairGoodSatisfactoryGoodFO297700
August 199968.0FairGoodSatisfactoryGoodFO216000
October 199757.0FairSatisfactorySatisfactoryFairFO151884
August 199546.0PoorFairPoorPoorSD151884
August 199357.0FairFairFairFairFO150000
June 199147.0FairSatisfactoryFairFairFO168882