Facts 

Name:RTE I95 over HHP & RIVERSIDE, RAMP HR
Structure number:00000000552250A
Location:I95 OVER HUDSON RIVER
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:252.0 ft. [76.8 m]
Total length:658.8 ft. [200.8 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:31.8 ft. [9.7 m]
Vertical clearance above deck:14.1 ft. [4.3 m]
Vertical clearance below bridge:14.4 ft. [4.4 m]
Owner:Local Toll Authority [32]
Year built:1962
Year reconstructed:1992
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:15
Main spans material:Concrete [1]
Main spans design:Arch - Deck [11]
Deck type:Other [9]
Wearing surface:Latex Concrete or similar additive [3]

Latest Available Inspection: October 2015 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Scour condition:Bridge not over waterway. [N]
Operating rating:84.2 tons [76.5 metric tons]
Inventory rating:32.3 tons [29.4 metric tons]
Sufficiency rating:75.3
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$23,662,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
October 201575.3FairSatisfactorySatisfactoryFairFO-
October 201359.2FairSatisfactorySatisfactoryFairFO12418
October 201159.2FairSatisfactorySatisfactoryFairFO12418
September 200959.2FairSatisfactorySatisfactoryFairFO12418
September 200761.0FairGoodSatisfactoryFairFO12418
July 200561.0FairGoodSatisfactoryFairFO12418
September 200360.0FairGoodSatisfactoryFairFO12418
September 200159.0FairGoodSatisfactorySatisfactoryFO272150
September 199959.0FairGoodSatisfactorySatisfactory-272150
September 199733.0PoorVery GoodSatisfactoryPoor-272150
September 199533.0PoorVery GoodFairPoor-272150
September 199333.0PoorVery GoodFairPoor-272150
April 199233.0PoorVery GoodFairPoor-272150
March 199248.0FairFairFairFairFO272150