HR12HP NB FRM GWB over RTE 907V, RTE 907V


+40.84642, -73.94451
40°50'47" N, 73°56'40" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.


Name:HR12HP NB FRM GWB over RTE 907V, RTE 907V
Structure number:00000000552254A
Location:800 FT S OF GEO WASHTN BR
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:112.9 ft. [34.4 m]
Total length:816.0 ft. [248.7 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:34.1 ft. [10.4 m]
Vertical clearance above deck:14.8 ft. [4.5 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Owner:Local Toll Authority [32]
Year built:1960
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:13
Main spans material:Prestressed concrete [5]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

Latest Available Inspection: August 2015 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:9,500 [as of 1966]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Underclearances appraisal:Basically intolerable requiring high priority of replacement [2]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Scour condition:Bridge not over waterway. [N]
Operating rating:87.6 tons [79.6 metric tons]
Inventory rating:21.6 tons [19.6 metric tons]
Sufficiency rating:48.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$27,213,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
August 201548.0FairFairFairSatisfactoryFO9500
August 201347.8FairFairFairSatisfactoryFO9500
August 201147.8FairFairFairSatisfactoryFO9500
August 200947.8FairFairFairSatisfactoryFO9500
July 200772.6FairFairSatisfactorySatisfactoryFO9500
July 200573.6FairSatisfactorySatisfactorySatisfactoryFO9500
September 200373.6FairSatisfactorySatisfactorySatisfactoryFO9500
August 200175.4FairSatisfactorySatisfactorySatisfactoryFO9500
September 199973.3FairSatisfactorySatisfactorySatisfactoryFO9500
September 199745.8PoorFairPoorFairSD9500
October 199542.7PoorPoorPoorPoorSD9500
October 199342.7PoorPoorPoorPoorSD9500
July 199142.7PoorPoorPoorPoorSD9500