Share:

HUNTER ROAD over MOHICAN RIVER

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+40.45000, -82.20833
40°27'00" N, 82°12'30" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:HUNTER ROAD over MOHICAN RIVER
Structure number:4237374
Location:0.6 MI E. OF TIGER VALLEY
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:149.9 ft. [45.7 m]
Total length:304.1 ft. [92.7 m]
Roadway width between curbs:15.7 ft. [4.8 m]
Deck width edge-to-edge:16.1 ft. [4.9 m]
Vertical clearance above deck:20.0 ft. [6.1 m]
Owner:County Highway Agency [02]
Year built:1904
Year reconstructed:1959
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Truss - Thru [10]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

Latest Available Inspection: April 2008

Good/Fair/Poor Condition:Poor
Status:Bridge closed to all traffic [K]
Average daily traffic:100 [as of 1997]
Deck condition:Critical [2 out of 9]
Superstructure condition:Critical [2 out of 9]
Substructure condition:Fair [5 out of 9]
Deck geometry appraisal:Equal to present desirable criteria [8]
Water adequacy appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Basically intolerable requiring high priority of replacement [2]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Sufficiency rating:17.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$480,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
April 2008PoorCriticalCriticalFair10017.6
October 1999PoorPoorPoorSatisfactory10017.6
April 1991FairFairFairSatisfactory5019.8