Share:

ADAMS ST over MIAMI RIVER

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+40.04333, -84.20833
40°02'36" N, 84°12'30" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:ADAMS ST over MIAMI RIVER
Structure number:5537126
Location:ADAMS ST IN TROY
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:81.0 ft. [24.7 m]
Total length:500.0 ft. [152.4 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:37.4 ft. [11.4 m]
Skew angle:
Owner:County Highway Agency [02]
Year built:1922
Year reconstructed:1991
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:M 13.5 / H 15 [2]
Number of main spans:7
Main spans material:Concrete [1]
Main spans design:Arch - Deck [11]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

Latest Available Inspection: February 2010

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:10,731 [as of 2002]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:37.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,252,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
February 2010PoorPoorPoorFair1073137.5
February 1999FairFairFairFair550459.2
April 1991FairSatisfactoryFairSatisfactory300062.1