S.H. 43 over CREEK
Map
Coordinates:
+34.53498, -96.1194734°32'06" N, 96°07'10" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | S.H. 43 over CREEK |
Structure number: | 006110000000000 |
Old structure number: | 1514 0560 X (from 1992 edition) |
Location: | 5.6 MI E US75 |
Purpose: | Carries highway over waterway |
Route classification: | Major Collector (Rural) [07] |
Length of largest span: | 9.8 ft. [3.0 m] |
Total length: | 24.0 ft. [7.3 m] |
Roadway width between curbs: | 29.9 ft. [9.1 m] |
Deck width edge-to-edge: | 33.1 ft. [10.1 m] |
Skew angle: | 45° |
Owner: | State Highway Agency [01] |
Year built: | 1918 |
Year reconstructed: | 1941 |
Historic significance: | Historical significance is not determinable at this time [4] |
Design load: | M 13.5 / H 15 [2] |
Number of main spans: | 2 |
Main spans material: | Concrete [1] |
Main spans design: | Slab [01] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: October 2018
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 1,100 [as of 2016] |
Truck traffic: | 15% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Good [7 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Equal to present minimum criteria [6] |
Deck geometry appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
Pier/abutment protection: | Navigation protection not required [1] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 90.2 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $1,120,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
October 2018 | Fair | Satisfactory | Good | Satisfactory | 1100 | 90.2 |
October 2016 | Fair | Satisfactory | Good | Satisfactory | 1100 | 90.2 |
September 2014 | Fair | Satisfactory | Good | Satisfactory | 1100 | 90.2 |
September 2012 | Fair | Satisfactory | Good | Satisfactory | 1100 | 90.2 |
September 2010 | Fair | Satisfactory | Good | Satisfactory | 1100 | 90.2 |
September 2008 | Fair | Satisfactory | Good | Satisfactory | 1100 | 90.2 |
May 2006 | Fair | Satisfactory | Good | Satisfactory | 740 | 95.7 |
March 2004 | Fair | Satisfactory | Good | Satisfactory | 520 | 73.9 |
May 2002 | Fair | Satisfactory | Good | Fair | 670 | 58.1 |
April 2000 | Fair | Satisfactory | Good | Satisfactory | 460 | 70.0 |
March 1996 | Fair | Fair | Satisfactory | Satisfactory | 550 | 80.4 |
December 1993 | Fair | Fair | Fair | Fair | 550 | 70.2 |
November 1991 | Fair | Fair | Fair | Fair | 550 | 71.2 |