Share:

S.H. 15 over CREEK

Map

Coordinates:
+36.41185, -99.54530
36°24'43" N, 99°32'43" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:S.H. 15 over CREEK
Structure number:096560000000000
Old structure number:7708 0394 X (from 1992 edition)
Location:3.9 MI NE ELLIS CO
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other (Rural) [02]
Length of largest span:9.8 ft. [3.0 m]
Total length:23.0 ft. [7.0 m]
Roadway width between curbs:84.6 ft. [25.8 m]
Deck width edge-to-edge:86.6 ft. [26.4 m]
Owner:State Highway Agency [01]
Year built:1941
Year reconstructed:2016
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: July 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:3,500 [as of 2015]
Truck traffic:25% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Culvert condition:Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:26.4 tons [24.0 metric tons]
Sufficiency rating:78.8
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$644,000

Previous Inspections

DateSuff. RatingConditionCulvert ConditionSD/FOADT
July 201678.8Fair6 out of 10-3500
October 201483.8Fair6 out of 10-3500
August 201283.8Fair6 out of 10-3500
November 201085.9Fair6 out of 10-2900
November 200886.2Fair6 out of 10-2800
February 200685.5Fair6 out of 10-3000
February 200390.7Good7 out of 10-1800
February 200191.3Good7 out of 10-1620
January 199989.3Good7 out of 10-1620
November 199686.3Good7 out of 10-2190
October 199486.6Good7 out of 10-2100
January 199388.4Fair6 out of 10-1900
January 199188.4Fair6 out of 10-1900