Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:S.H. 32 over BRIAR CREEK
Structure number:105480000000000
Old structure number:4806 0682 X (from 1992 edition)
Location:1.85 W JCT SH-99
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:44.9 ft. [13.7 m]
Total length:137.1 ft. [41.8 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:26.6 ft. [8.1 m]
Owner:State Highway Agency [01]
Year built:1946
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: January 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:920 [as of 2015]
Truck traffic:15% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Countermeasures have been installed to mitigate an existing problem with scour. [7]
Sufficiency rating:66.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,717,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
January 2017FairSatisfactoryGoodSatisfactory92066.3
January 2015FairSatisfactoryGoodSatisfactory92066.3
January 2013FairSatisfactoryGoodSatisfactory92066.3
January 2011FairSatisfactoryGoodSatisfactory92066.3
January 2009FairSatisfactoryGoodSatisfactory89066.3
January 2007FairSatisfactoryGoodSatisfactory110066.0
January 2005FairSatisfactoryGoodSatisfactory90049.2
January 2003FairSatisfactoryGoodSatisfactory83049.3
February 2001FairSatisfactoryGoodGood54051.0
February 1999FairSatisfactoryGoodGood54058.1
February 1997FairSatisfactoryGoodGood66057.9
January 1996FairFairGoodSatisfactory65063.5
November 1994FairFairSatisfactoryGood65063.5
September 1992FairFairSatisfactoryGood60063.6
September 1990FairFairSatisfactoryGood60063.6