Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:E0150 over THOMPSON CREEK
Structure number:123840000000000
Location:2W 1S of I-35/SH11
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:88.3 ft. [26.9 m]
Total length:91.9 ft. [28.0 m]
Roadway width between curbs:17.4 ft. [5.3 m]
Deck width edge-to-edge:18.0 ft. [5.5 m]
Owner:County Highway Agency [02]
Year built:1929
Year reconstructed:1959
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

Latest Available Inspection: November 2009

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:75 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:29.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$485,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
November 2009PoorFairPoorFair7529.9
December 1999PoorVery GoodCriticalSatisfactory7530.9