I-40 over CHOCTAW ROAD UNDER

Map

Coordinates:
+35.50172, -97.95506
35°30'06" N, 97°57'18" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:I-40 over CHOCTAW ROAD UNDER
Structure number:167240000000000
Location:20.6 MI. E. CADDO CO
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:40.0 ft. [12.2 m]
Total length:102.0 ft. [31.1 m]
Roadway width between curbs:37.1 ft. [11.3 m]
Deck width edge-to-edge:40.4 ft. [12.3 m]
Vertical clearance below bridge:13.1 ft. [4.0 m]
Skew angle:13°
Owner:State Highway Agency [01]
Year built:1966
Year reconstructed:2008
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

Latest Available Inspection: April 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:13,200 [as of 2016]
Truck traffic:43% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Underclearances appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Scour condition:Bridge not over waterway. [N]
Sufficiency rating:95.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,064,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
April 2017FairSatisfactorySatisfactorySatisfactory1320095.0
April 2015FairSatisfactorySatisfactorySatisfactory1320095.0
April 2013FairGoodGoodSatisfactory1320095.0
March 2011FairVery GoodGoodSatisfactory1275095.0
February 2009FairVery GoodGoodSatisfactory1265095.0
March 2007FairFairSatisfactorySatisfactory1485094.0
February 2005FairGoodSatisfactorySatisfactory1380095.0
August 2002PoorFairPoorGood1548055.8
May 2000FairFairFairGood1548075.3
August 1996FairFairFairGood1354076.4
August 1994FairSatisfactorySatisfactorySatisfactory1125089.8
November 1992FairSatisfactorySatisfactorySatisfactory1084091.0

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Reinforced Concrete Columneach66000
Reinforced Concrete Abutmentlinear ft.82532720
Reinforced Concrete Pier Caplinear ft.8276600
Joints
Pourable Jointlinear ft.8208200
Bearings
Elastomeric Bearingeach42200
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.2031653800
Concrete Protective Coatingsq. ft.1,08301,08300
Deck
Reinforced Concrete Slabsq. ft.3,7741,1322,64200