Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:S.H. 19 over CREEK
Structure number:168700000000000
Location:6.3 MI E S.H. 54
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:9.8 ft. [3.0 m]
Total length:34.1 ft. [10.4 m]
Roadway width between curbs:58.1 ft. [17.7 m]
Deck width edge-to-edge:60.0 ft. [18.3 m]
Owner:State Highway Agency [01]
Year built:1967
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: May 2017

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:160 [as of 2016]
Truck traffic:15% of total traffic
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:98.5
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$644,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
May 2017Good7 out of 1016098.5
June 2015Good7 out of 1016098.5
May 2013Good7 out of 1016098.5
May 2011Good7 out of 1016098.5
May 2009Good7 out of 1017098.5
May 2007Good7 out of 1026096.3
May 2005Good7 out of 1019096.4
June 2003Good7 out of 1022096.4
April 2001Good7 out of 1019095.4
February 1999Good7 out of 1019095.4
March 1996Good7 out of 1018095.5
February 1995Good7 out of 1023096.3
March 1993Good7 out of 1023096.3
March 1991Fair6 out of 1025098.3