Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:E0470 over SEMINOLE CREEK
Structure number:256640000000000
Location:5.5NW OF US 69 AND SH 20
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:62.0 ft. [18.9 m]
Total length:64.0 ft. [19.5 m]
Roadway width between curbs:23.0 ft. [7.0 m]
Deck width edge-to-edge:25.9 ft. [7.9 m]
Owner:County Highway Agency [02]
Year built:1996
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: April 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:75 [as of 2016]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:84.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$400,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
April 2017FairGoodGoodFair7584.0
September 2015FairGoodGoodFair7584.0
November 2013FairGoodGoodFair7584.0
November 2011FairGoodGoodFair7584.0
November 2009FairGoodGoodSatisfactory7595.0
November 2007GoodGoodGoodGood7595.0
November 2005GoodGoodGoodGood7595.0
October 2003PoorGoodFairPoor7568.0
November 2001FairGoodFairFair7556.2
February 2000PoorCriticalCriticalCritical7534.9
March 1997FairGoodSatisfactoryGood7541.2