Share:

N2380 over TURKEY CREEK

Map

Coordinates:
+34.20889, -96.62500
34°12'32" N, 96°37'30" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:N2380 over TURKEY CREEK
Structure number:269740000000000
Location:6W 2.7N OF US64/281S
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:29.9 ft. [9.1 m]
Total length:60.0 ft. [18.3 m]
Roadway width between curbs:25.3 ft. [7.7 m]
Deck width edge-to-edge:25.9 ft. [7.9 m]
Owner:County Highway Agency [02]
Year built:2001
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Other [9]

Latest Available Inspection: January 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:20 [as of 2015]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:43.9 tons [39.9 metric tons]
Inventory rating:26.0 tons [23.6 metric tons]
Sufficiency rating:83.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$413,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
January 201683.5FairGoodSatisfactorySatisfactory-20
January 201483.5FairGoodGoodSatisfactory-20
January 201283.5FairGoodGoodSatisfactory-20
February 201083.5FairGoodGoodSatisfactory-20
March 200883.5FairGoodGoodSatisfactory-20
April 200683.5FairGoodGoodSatisfactory-24
January 200456.5PoorGoodPoorFair-20
January 200272.8FairGoodFairSatisfactory-20