Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:E0775 (POWELL RD.) over TAHLEQUAH CREEK
Structure number:274660000000000
Location:1E 1S OF TAHLEQUAH
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:14.4 ft. [4.4 m]
Total length:47.6 ft. [14.5 m]
Roadway width between curbs:30.8 ft. [9.4 m]
Deck width edge-to-edge:34.1 ft. [10.4 m]
Skew angle:30°
Owner:County Highway Agency [02]
Year built:2001
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: August 2018

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:150 [as of 2016]
Truck traffic:10% of total traffic
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:97.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$225,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
August 2018Good7 out of 1015097.0
June 2017Good7 out of 1015097.0
September 2015Good7 out of 1015097.0
October 2013Poor4 out of 1015070.0
September 2011Poor4 out of 1015070.0
November 2009Fair6 out of 1015097.0
June 2007Good9 out of 1015097.0
May 2005Good9 out of 1015097.0