Share:

HWY 281 over HOOD RIVER TUCKER BR

Map

Coordinates:
+45.65488, -121.54879
45°39'18" N, 121°32'56" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:HWY 281 over HOOD RIVER TUCKER BR
Structure number:01600 281 00495
Location:4.0 MI S SCL HOOD RIVER
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:100.1 ft. [30.5 m]
Total length:188.0 ft. [57.3 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:27.6 ft. [8.4 m]
Owner:State Highway Agency [01]
Year built:1931
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Design load:M 13.5 / H 15 [2]
Main span material:Concrete [1]
Main span design:Arch - Deck [11]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: July 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:8,300 [as of 2017]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:36.4

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
July 2018FairSatisfactorySatisfactoryFair830036.4
July 2016FairSatisfactorySatisfactoryFair220046.3
July 2014FairSatisfactorySatisfactoryFair180049.7
July 2012FairSatisfactorySatisfactoryFair180049.7
July 2010FairSatisfactorySatisfactoryFair810036.4
July 2008FairSatisfactorySatisfactoryFair810036.4
September 2006FairSatisfactorySatisfactoryFair690036.4
July 2004FairSatisfactorySatisfactorySatisfactory730046.2
July 2002FairSatisfactorySatisfactorySatisfactory720046.2
May 2001FairSatisfactorySatisfactorySatisfactory700046.2
May 1999GoodGoodGoodGood700046.2
May 1997GoodGoodGoodGood680048.5
May 1995GoodGoodGoodGood195060.7
May 1993GoodGoodGoodGood195061.9
May 1991FairVery GoodGoodSatisfactory160062.5

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Reinforced Concrete Girder/Beamlinear ft.3522827000
Deck
Reinforced Concrete Decksq. ft.2,4341,9463661220
Wearing Surfacessq. ft.2,4342,434000
Superstructure
Reinforced Concrete Archlinear ft.20017020100
Reinforced Concrete Floor Beamlinear ft.2782502800
Substructure
Reinforced Concrete Columneach87100
Reinforced Concrete Abutmentlinear ft.55451000
Reinforced Concrete Pier Caplinear ft.110852500
Joints
Other Jointlinear ft.5454000
Bearings
Movable Bearingeach80800
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.39024015000
Deck
Reinforced Concrete Slabsq. ft.2,7652,2124151380
Wearing Surfacessq. ft.2,7652,765000