HWY 1W/EVERETT RMP over FRONT AVENUE

Map

Coordinates:
+45.52810, -122.66787
45°31'41" N, 122°40'04" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:HWY 1W/EVERETT RMP over FRONT AVENUE
Structure number:02733B01WX00052
Location:AT WEST END OF STEEL BR
Purpose:Carries highway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:60.4 ft. [18.4 m]
Total length:232.0 ft. [70.7 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:29.5 ft. [9.0 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1950
Year reconstructed:1985
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

Latest Available Inspection: February 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:3,500 [as of 2014]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Equal to present desirable criteria [8]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Scour condition:Bridge not over waterway. [N]
Operating rating:23.0 tons [20.9 metric tons]
Inventory rating:14.0 tons [12.7 metric tons]
Sufficiency rating:62.0
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$1,174,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
February 201662.0FairSatisfactorySatisfactorySatisfactoryFO3500
February 201459.6FairSatisfactorySatisfactorySatisfactoryFO5712
February 201259.6FairSatisfactorySatisfactorySatisfactoryFO5712
January 200959.6FairGoodSatisfactoryGoodFO5712
January 200759.7FairGoodSatisfactoryGoodFO5490
January 200552.2FairSatisfactoryFairSatisfactoryFO5330
January 200332.1FairGoodFairGoodFO5330
January 200145.3GoodGoodGoodGoodFO4100
January 199945.3GoodGoodGoodGoodFO4000
January 199776.5GoodGoodGoodGoodFO4000
January 199576.6GoodGoodGoodGoodFO4000
January 199376.6GoodGoodGoodGood-4000
January 199178.7GoodGoodGoodGood-3500

Element Data

Source: National Bridge Elements dataset, 2016 edition. This feature is experimental.
ElementUnitsQuantity1. Good2. Fair3. Poor4. Serious
Superstructure
Reinforced Concrete Girder/Beamlinear ft.1,5277586271420
Deck
Reinforced Concrete Decksq. ft.10,0215,9333,0861,0020
Substructure
Reinforced Concrete Columneach1211100
Reinforced Concrete Abutmentlinear ft.3003000
Reinforced Concrete Pier Caplinear ft.2061436300
Bearings
Movable Bearingeach1401400
Enclosed/Concealed Bearingeach1010000
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.1991495000
Steel Protective Coatingsq. ft.2,91402,91400
Reinforced Concrete Bridge Raillinear ft.50301034000