Facts 

Name:BROADWAY ST over WILLAMETTE RIVER
Structure number:06757 000000000
Location:WILLAMETTE RIVER MP 11.7
Purpose:Carries highway and pedestrian walkway over highway, waterway, and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:304.1 ft. [92.7 m]
Total length:1742.2 ft. [531.0 m]
Roadway width between curbs:45.6 ft. [13.9 m]
Deck width edge-to-edge:70.5 ft. [21.5 m]
Vertical clearance above deck:13.1 ft. [4.0 m]
Vertical clearance below bridge:89.9 ft. [27.4 m]
Owner:County Highway Agency [02]
Year built:1912
Year reconstructed:1927
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Main span material:Steel [3]
Main span design:Movable - Bascule [16]
Deck type:Other [9]
Wearing surface:Epoxy Overlay [5]

Latest Available Inspection: July 2015 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:29,371 [as of 2010]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Underclearances appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:46.9 tons [42.6 metric tons]
Inventory rating:27.9 tons [25.4 metric tons]
Sufficiency rating:58.8
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$8,925,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
July 201558.8FairSatisfactorySatisfactorySatisfactoryFO29371
July 201358.8FairGoodSatisfactorySatisfactoryFO29371
August 201158.8FairGoodSatisfactorySatisfactoryFO29371
December 200958.8FairGoodSatisfactorySatisfactoryFO29371
October 200758.9FairGoodSatisfactorySatisfactoryFO29080
June 200561.1FairGoodSatisfactorySatisfactoryFO28233
June 200358.9FairFairSatisfactorySatisfactoryFO27411
July 200159.1FairFairSatisfactorySatisfactoryFO26613
July 200059.1FairFairSatisfactorySatisfactoryFO26613
August 199861.3FairFairSatisfactorySatisfactoryFO15965
July 199638.4FairFairSatisfactoryFairFO15965
August 199438.0FairFairSatisfactoryFairFO15965
July 199237.7FairFairSatisfactoryFairFO27650
July 199039.1FairSatisfactorySatisfactoryFairFO27266