Share:

HWY 40 CAPITOL HWY over B-139 X BARBUR BLVD

Map

Coordinates:
+45.48033, -122.68022
45°28'49" N, 122°40'49" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:HWY 40 CAPITOL HWY over B-139 X BARBUR BLVD
Structure number:08551 040 00672
Location:CAPITOL HWY AT BARBUR BVD
Purpose:Carries highway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:105.0 ft. [32.0 m]
Total length:554.2 ft. [168.9 m]
Roadway width between curbs:21.0 ft. [6.4 m]
Deck width edge-to-edge:25.9 ft. [7.9 m]
Vertical clearance below bridge:17.4 ft. [5.3 m]
Owner:City or Municipal Highway Agency [04]
Year built:1959
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Epoxy Overlay [5]

Latest Available Inspection: September 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:9,458 [as of 2010]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Underclearances appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Basically intolerable requiring high priority of corrrective action [3]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.9 tons [53.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:87.5
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$2,396,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
September 201687.5FairSatisfactorySatisfactorySatisfactoryFO9458
September 201491.6FairSatisfactorySatisfactorySatisfactoryFO9458
September 201291.6FairSatisfactorySatisfactorySatisfactoryFO9458
March 201192.6FairSatisfactorySatisfactoryGoodFO9458
February 200991.6FairFairGoodGoodFO9458
September 200691.6FairFairGoodGoodFO9091
October 200492.7FairSatisfactoryGoodGoodFO9091
September 200292.7FairSatisfactoryVery GoodGoodFO8827
May 200092.7GoodGoodVery GoodGoodFO8570
May 199892.7GoodGoodVery GoodGoodFO8570
February 199892.7GoodGoodVery GoodGoodFO8570
March 199692.7GoodGoodVery GoodGoodFO8570
April 199492.7GoodGoodVery GoodGoodFO8570
April 199286.4FairSatisfactoryGoodGoodFO15700
April 199086.5FairSatisfactoryGoodGoodFO15100