Share:

INTERSTATE 376 WB over ABDN RR,2ND AVE,10TH ST

Map

Coordinates:
+40.43437, -79.99578
40°26'04" N, 79°59'45" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:INTERSTATE 376 WB over ABDN RR,2ND AVE,10TH ST
Structure number:000000000001133
Old structure number:020376001100000 (from 1992 edition)
Location:1/4 MI. E.OF LIBERTY BR.
Purpose:Carries highway over highway and railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:180.1 ft. [54.9 m]
Total length:1750.1 ft. [533.4 m]
Roadway width between curbs:43.0 ft. [13.1 m]
Deck width edge-to-edge:46.9 ft. [14.3 m]
Vertical clearance above deck:17.7 ft. [5.4 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1956
Year reconstructed:1985
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:7
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: September 2015

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:13,075 [as of 2015]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.9 tons [53.5 metric tons]
Inventory rating:35.0 tons [31.8 metric tons]
Sufficiency rating:65.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
September 201565.9FairGoodFairSatisfactoryFO13075
October 201365.8FairGoodFairSatisfactoryFO13788
October 201165.9FairGoodFairGoodFO14062
October 200965.9FairGoodFairGoodFO20749
October 200766.0FairGoodFairGoodFO25438
October 200564.0FairGoodFairFairFO28089
October 200364.0FairGoodFairFairFO26425
October 200164.0FairGoodFairFairFO25150
October 199964.0FairGoodFairSatisfactoryFO25150
October 199768.0FairGoodFairSatisfactoryFO59030
November 199532.4FairGoodFairSatisfactoryFO56187
October 199332.4FairGoodFairSatisfactoryFO54817