Share:

CROSSTOWN BL over STATE RDS.,RR,CITY STS..

Map 

Coordinates:
+40.44349, -79.99126
40°26'37" N, 79°59'29" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:CROSSTOWN BL over STATE RDS.,RR,CITY STS..
Structure number:000000000002043
Old structure number:026579001000540 (from 1992 edition)
Location:HOV S.APPR.TO VETERANS BR
Purpose:Carries highway over highway and railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:210.0 ft. [64.0 m]
Total length:2176.9 ft. [663.5 m]
Roadway width between curbs:28.9 ft. [8.8 m]
Deck width edge-to-edge:31.8 ft. [9.7 m]
Vertical clearance above deck:21.3 ft. [6.5 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1986
Year reconstructed:2012
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:15
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: April 2015 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:1,648 [as of 2015]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Underclearances appraisal:Basically intolerable requiring high priority of replacement [2]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Scour condition:Bridge not over waterway. [N]
Operating rating:84.8 tons [77.1 metric tons]
Inventory rating:65.9 tons [59.9 metric tons]
Sufficiency rating:84.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$16,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
April 201584.8FairGoodGoodSatisfactory-1648
April 201387.8FairGoodGoodSatisfactory-1738
April 201186.8FairGoodGoodSatisfactoryFO2117
April 200986.8FairGoodGoodSatisfactoryFO2140
April 200786.8FairGoodGoodSatisfactoryFO2140
May 200587.8FairGoodGoodSatisfactoryFO1922
May 200386.8FairSatisfactoryGoodSatisfactoryFO2588
May 200184.8FairSatisfactoryGoodSatisfactoryFO2497
May 199984.8FairSatisfactoryGoodSatisfactoryFO2497
May 199794.0FairSatisfactoryGoodSatisfactoryFO2362
May 199592.0FairSatisfactoryGoodSatisfactoryFO2263
April 199392.0FairGoodGoodSatisfactory-2192