Share:

TENTH STREET BR over I376 AND CSX RR

Map

Coordinates:
+40.43260, -79.98920
40°25'57" N, 79°59'21" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:TENTH STREET BR over I376 AND CSX RR
Structure number:000000000002388
Old structure number:027301000023910 (from 1992 edition)
Location:MA11 SOUTH 10TH ST BRDG
Purpose:Carries highway and pedestrian walkway over highway, waterway, and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:725.1 ft. [221.0 m]
Total length:1275.0 ft. [388.6 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:42.0 ft. [12.8 m]
Vertical clearance below bridge:3277.7 ft. [999.0 m]
Owner:County Highway Agency [02]
Year built:1933
Year reconstructed:1994
Historic significance:Bridge is on the National Register of Historic Places [1]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Suspension [13]
Deck type:Closed Grating [4]
Wearing surface:Bituminous [6]

Latest Available Inspection: May 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:18,372 [as of 2005]
Truck traffic:9% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Underclearances appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:56.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,055,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2017FairSatisfactorySatisfactoryFair1837256.9
May 2015FairSatisfactorySatisfactoryFair1837256.9
May 2013FairSatisfactorySatisfactoryFair1837256.9
May 2011FairSatisfactorySatisfactoryFair1837256.9
June 2009FairSatisfactorySatisfactoryFair1837256.9
June 2007FairSatisfactorySatisfactorySatisfactory1837268.6
2005Fair--Satisfactory1837256.0
December 2005FairSatisfactorySatisfactorySatisfactory1837268.6
June 2005FairSatisfactorySatisfactorySatisfactory1837268.6
June 2003FairSatisfactorySatisfactorySatisfactory1837269.7
June 2001FairSatisfactorySatisfactoryGood1837268.6
May 1999FairSatisfactoryGoodGood1837268.6
November 1996GoodGoodGoodGood1837268.6
November 1994GoodGoodGoodGood1837268.4
February 1994PoorGoodPoorFair1837246.8
October 1991PoorGoodPoorFair1837246.8
September 1989FairGoodSatisfactorySatisfactory1299072.5