Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:FOURTH AV over CREEK
Structure number:000000000003455
Old structure number:040018072000000 (from 1992 edition)
Location:3200' NORTH OF SR 0551
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:80.1 ft. [24.4 m]
Total length:505.9 ft. [154.2 m]
Roadway width between curbs:61.7 ft. [18.8 m]
Deck width edge-to-edge:68.2 ft. [20.8 m]
Owner:State Highway Agency [01]
Year built:1950
Year reconstructed:1995
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:5
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

Latest Available Inspection: September 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:12,379 [as of 2018]
Truck traffic:12% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:76.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$683,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
September 2018FairSatisfactoryFairSatisfactory1237976.3
May 2017FairSatisfactoryFairSatisfactory1448174.5
July 2016FairSatisfactoryFairSatisfactory1448174.5
July 2014FairSatisfactoryFairSatisfactory1190278.8
July 2012FairGoodFairSatisfactory574184.1
July 2010FairGoodFairSatisfactory635183.5
July 2008FairGoodFairSatisfactory635182.5
July 2006FairGoodFairSatisfactory1186877.8
July 2004FairGoodFairSatisfactory1175178.9
July 2002FairGoodFairSatisfactory1152879.1
November 2000FairGoodSatisfactorySatisfactory1132391.5
October 1998FairGoodSatisfactorySatisfactory1132391.5
July 1996FairVery GoodSatisfactorySatisfactory1114791.6
October 1994PoorSeriousSeriousSerious1087531.0
December 1992PoorSeriousSeriousSerious1582731.0
October 1991PoorSeriousSeriousSerious1522531.0

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Steel Girder/Beamlinear ft.5,0095,009000
Steel Protective Coatingsq. ft.120,576120,5611500
Deck
Reinforced Concrete Decksq. ft.22,35914,9597,40000
Substructure
Reinforced Concrete Columneach86200
Reinforced Concrete Pier Walllinear ft.6868000
Reinforced Concrete Abutmentlinear ft.80673100
Reinforced Concrete Pier Caplinear ft.1321151430
Joints
Strip Seal Jointlinear ft.342342000
Bearings
Elastomeric Bearingeach128128000
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.1,4711,4512000