KUTZ MILL ROAD over SACONY CREEK
Map
Coordinates:
+40.53370, -75.8054040°32'01" N, 75°48'19" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | KUTZ MILL ROAD over SACONY CREEK |
Structure number: | 000000000005370 |
Old structure number: | 067215080394650 (from 1992 edition) |
Location: | 1 MI. NW OF KUTZTOWN |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 90.9 ft. [27.7 m] |
Total length: | 94.2 ft. [28.7 m] |
Roadway width between curbs: | 15.1 ft. [4.6 m] |
Deck width edge-to-edge: | 15.4 ft. [4.7 m] |
Vertical clearance above deck: | 11.8 ft. [3.6 m] |
Owner: | County Highway Agency [02] |
Year built: | 1869 |
Year reconstructed: | 1960 |
Historic significance: | Historical significance is not determinable at this time [4] |
Design load: | MS 18 / HS 20 [5] |
Main span material: | Steel [3] |
Main span design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: August 2018
Good/Fair/Poor Condition: | Poor |
Status: | Posted for other load-capacity restriction [R] |
Average daily traffic: | 391 [as of 2016] |
Truck traffic: | 1% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Satisfactory [6 out of 9] |
Substructure condition: | Poor [4 out of 9] |
Structural appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Bridge is scour critical; bridge foundations determined to be unstable. [3] |
Sufficiency rating: | 50.7 |
Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
Estimated cost of work: | $110,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
August 2018 | Poor | Satisfactory | Satisfactory | Poor | 391 | 50.7 |
August 2016 | Fair | Satisfactory | Satisfactory | Fair | 391 | 66.7 |
January 2015 | Fair | Satisfactory | Satisfactory | Fair | 318 | 66.7 |
January 2014 | Fair | Satisfactory | Satisfactory | Satisfactory | 318 | 77.7 |
February 2013 | Fair | Satisfactory | Satisfactory | Satisfactory | 318 | 79.7 |
February 2012 | Fair | Satisfactory | Satisfactory | Satisfactory | 200 | 79.7 |
February 2011 | Fair | Good | Satisfactory | Satisfactory | 200 | 79.7 |
July 2009 | Fair | Good | Satisfactory | Satisfactory | 180 | 79.7 |
July 2007 | Fair | Good | Satisfactory | Satisfactory | 180 | 79.7 |
July 2005 | Fair | Good | Satisfactory | Satisfactory | 180 | 79.7 |
July 2003 | Good | Good | Good | Good | 180 | 79.7 |