CHADDSFORD ROAD over BRANCH BRANDYWINE CREEK
Map
Coordinates:
+39.84419, -75.5982439°50'39" N, 75°35'54" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | CHADDSFORD ROAD over BRANCH BRANDYWINE CREEK |
Structure number: | 000000000010056 |
Old structure number: | 153100002000000 (from 1992 edition) |
Location: | .5MI.N.DEL.LINE 49B05 |
Purpose: | Carries highway over waterway |
Route classification: | Collector (Urban) [17] |
Length of largest span: | 21.0 ft. [6.4 m] |
Total length: | 21.0 ft. [6.4 m] |
Roadway width between curbs: | 23.3 ft. [7.1 m] |
Deck width edge-to-edge: | 27.9 ft. [8.5 m] |
Skew angle: | 19° |
Owner: | State Highway Agency [01] |
Year built: | 1860 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Main span material: | Concrete [1] |
Main span design: | Arch - Deck [11] |
Deck type: | Not applicable [N] |
Latest Available Inspection: April 2018
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 2,388 [as of 2018] |
Truck traffic: | 4% of total traffic |
Superstructure condition: | Satisfactory [6 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Equal to present minimum criteria [6] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Countermeasures have been installed to mitigate an existing problem with scour. [7] |
Sufficiency rating: | 75.7 |
Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
Estimated cost of work: | $68,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
April 2018 | Fair | - | Satisfactory | Satisfactory | 2388 | 75.7 |
April 2016 | Fair | - | Satisfactory | Satisfactory | 2370 | 75.7 |
April 2014 | Fair | - | Satisfactory | Satisfactory | 2081 | 76.0 |
April 2012 | Fair | - | Satisfactory | Satisfactory | 2104 | 76.0 |
April 2010 | Fair | - | Satisfactory | Satisfactory | 2194 | 75.9 |
April 2008 | Fair | - | Satisfactory | Satisfactory | 2539 | 75.6 |
May 2006 | Fair | - | Satisfactory | Satisfactory | 2489 | 75.6 |
May 2004 | Fair | - | Satisfactory | Satisfactory | 2430 | 74.6 |
May 2002 | Fair | - | Satisfactory | Fair | 2349 | 63.2 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Reinforced Concrete Arch | linear ft. | 21 | 20 | 1 | 0 | 0 |
Substructure |
Reinforced Concrete Abutment | linear ft. | 56 | 56 | 0 | 0 | 0 |
Bridge Rail |
Other Material Bridge Rail | linear ft. | 42 | 37 | 0 | 0 | 5 |