Share:

GREENLANE DRIVE over YELLOW BREECHES CREEK

Map

Coordinates:
+40.22440, -76.89800
40°13'28" N, 76°53'53" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:GREENLANE DRIVE over YELLOW BREECHES CREEK
Structure number:000000000014041
Old structure number:217102064838020 (from 1992 edition)
Location:N.GRN LANE FARM/YEL.BRCH.
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:130.9 ft. [39.9 m]
Total length:132.9 ft. [40.5 m]
Roadway width between curbs:12.8 ft. [3.9 m]
Deck width edge-to-edge:16.1 ft. [4.9 m]
Vertical clearance above deck:14.4 ft. [4.4 m]
Owner:County Highway Agency [02]
Year built:1889
Historic significance:Bridge is on the National Register of Historic Places [1]
Main span material:Aluminum, Wrought Iron or Cast Iron [9]
Main span design:Truss - Thru [10]
Deck type:Open Grating [3]

Latest Available Inspection: August 2017

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:2,808 [as of 2017]
Truck traffic:1% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Basically intolerable requiring high priority of corrrective action [3]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Sufficiency rating:17.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$899,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
August 2017FairVery GoodFairFair280817.3
August 2015FairSatisfactoryFairFair280813.5
August 2013FairSatisfactoryFairFair280812.9
August 2012FairSatisfactoryFairFair280811.6
August 2011FairSatisfactoryFairFair280813.5
August 2009FairSatisfactoryFairFair315012.7
August 2008FairSatisfactoryFairFair315016.8
August 2007FairSatisfactoryFairFair315016.8
October 2005FairGoodFairFair315016.8
October 2003FairGoodFairFair315016.3
October 2002PoorGoodFairPoor31505.5
November 2001PoorGoodFairPoor31505.5
November 2000FairGoodFairFair300016.6
November 1999FairGoodFairFair300016.6
October 1998FairGoodFairFair300036.7
October 1997PoorGoodFairPoor300018.9
October 1996PoorGoodFairPoor300018.9
October 1995FairGoodFairFair300036.6
October 1994FairGoodSatisfactoryFair300036.6
October 1993FairVery GoodSatisfactoryFair300034.5
October 1991FairVery GoodFairFair300035.5
November 1990FairVery GoodGoodFair300035.5