SR0217 over CONEMAUGH RIVER
Map
Coordinates:
+40.41636, -79.2661840°24'59" N, 79°15'58" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | SR0217 over CONEMAUGH RIVER |
Structure number: | 000000000019057 |
Old structure number: | 320217001000000 (from 1992 edition) |
Location: | TORRANCE |
Purpose: | Carries highway over waterway |
Route classification: | Minor Arterial (Urban) [16] |
Length of largest span: | 125.0 ft. [38.1 m] |
Total length: | 456.1 ft. [139.0 m] |
Roadway width between curbs: | 30.8 ft. [9.4 m] |
Deck width edge-to-edge: | 34.5 ft. [10.5 m] |
Owner: | State Highway Agency [01] |
Year built: | 1952 |
Year reconstructed: | 1985 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Number of main spans: | 4 |
Main spans material: | Steel continuous [4] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Epoxy Overlay [5] |
Latest Available Inspection: January 2017
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 8,514 [as of 2017] |
Truck traffic: | 12% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Water adequacy appraisal: | Superior to present desirable criteria [9] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
Sufficiency rating: | 72.7 |
Recommended work: | Bridge deck rehabilitation with only incidental widening. [36] |
Estimated cost of work: | $845,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
January 2017 | Fair | Good | Fair | Satisfactory | 8514 | 72.7 |
October 2015 | Fair | Good | Fair | Satisfactory | 8566 | 72.7 |
November 2013 | Fair | Good | Fair | Satisfactory | 7871 | 73.8 |
August 2012 | Fair | Good | Fair | Fair | 8123 | 73.7 |
October 2010 | Fair | Good | Fair | Fair | 8211 | 73.7 |
April 2009 | Fair | Good | Fair | Fair | 8565 | 73.5 |
April 2007 | Fair | Good | Satisfactory | Fair | 8565 | 73.5 |
June 2005 | Fair | Satisfactory | Satisfactory | Fair | 8429 | 73.5 |
December 2004 | Fair | Satisfactory | Satisfactory | Fair | 10042 | 72.8 |
June 2003 | Fair | Satisfactory | Satisfactory | Fair | 9894 | 72.9 |
August 2002 | Fair | Satisfactory | Satisfactory | Fair | 9700 | 73.0 |
November 2001 | Fair | Satisfactory | Satisfactory | Fair | 9604 | 73.0 |
October 2000 | Fair | Satisfactory | Satisfactory | Fair | 9604 | 73.0 |
August 1998 | Fair | Satisfactory | Satisfactory | Good | 11023 | 83.6 |
March 1997 | Fair | Satisfactory | Satisfactory | Good | 10595 | 83.7 |
October 1996 | Fair | Satisfactory | Satisfactory | Good | 10387 | 83.8 |
May 1995 | Fair | Satisfactory | Satisfactory | Good | 10387 | 84.6 |
December 1994 | Fair | Satisfactory | Satisfactory | Good | 8695 | 85.2 |
May 1993 | Fair | Satisfactory | Satisfactory | Good | 8592 | 85.3 |
May 1991 | Fair | Satisfactory | Satisfactory | Good | 8418 | 85.3 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Steel Girder/Beam | linear ft. | 2,700 | 2,700 | 0 | 0 | 0 |
Steel Protective Coating | sq. ft. | 43,013 | 43,013 | 0 | 0 | 0 |
Substructure |
Reinforced Concrete Column | each | 4 | 4 | 0 | 0 | 0 |
Reinforced Concrete Pier Wall | linear ft. | 115 | 115 | 0 | 0 | 0 |
Reinforced Concrete Abutment | linear ft. | 103 | 103 | 0 | 0 | 0 |
Reinforced Concrete Pier Cap | linear ft. | 105 | 105 | 0 | 0 | 0 |
Joints |
Compression Joint | linear ft. | 68 | 68 | 0 | 0 | 0 |
Bearings |
Movable Bearing | each | 24 | 24 | 0 | 0 | 0 |
Steel Protective Coating | sq. ft. | 32,259 | 32,259 | 0 | 0 | 0 |
Fixed Bearing | each | 6 | 6 | 0 | 0 | 0 |
Steel Protective Coating | sq. ft. | 10,753 | 10,753 | 0 | 0 | 0 |
Bridge Rail |
Reinforced Concrete Bridge Rail | linear ft. | 910 | 910 | 0 | 0 | 0 |