Share:

YORTY BRIDGE ROAD over SWATARA CREEK

Map

Coordinates:
+40.39510, -76.55130
40°23'42" N, 76°33'05" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:YORTY BRIDGE ROAD over SWATARA CREEK
Structure number:000000000022862
Old structure number:387207037830220 (from 1992 edition)
Location:1 MI N OF SR 934
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:49.9 ft. [15.2 m]
Total length:213.9 ft. [65.2 m]
Roadway width between curbs:16.1 ft. [4.9 m]
Deck width edge-to-edge:17.1 ft. [5.2 m]
Owner:County Highway Agency [02]
Year built:1924
Year reconstructed:1995
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Other [00]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

Latest Available Inspection: May 2018

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:200 [as of 2013]
Truck traffic:20% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Meets minimum tolerable limits to be left in place as is [4]
Channel protection:Bank protection has failed. River control devices have been destroyed. Stream bed aggradation, degradation or lateral movement has changed the channel to now threaten the bridge and/or approach roadway. [3]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:24.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$156,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2018PoorPoorPoorPoor20024.5
May 2016PoorPoorPoorPoor20024.5
May 2014PoorPoorPoorPoor20024.5
May 2012PoorPoorPoorPoor20025.6
May 2010PoorPoorPoorPoor20024.2
May 2009PoorPoorPoorPoor20024.2
May 2008PoorPoorPoorPoor20024.2
May 2006PoorPoorPoorPoor20024.2
May 2005PoorFairPoorPoor20026.1
October 2004PoorFairPoorPoor20026.1
July 2003PoorFairPoorPoor20026.1
June 2002PoorFairPoorPoor20026.1
July 2001PoorFairPoorPoor20026.1
May 2000PoorFairPoorPoor20026.1
May 1999PoorFairPoorFair20026.1
May 1998PoorFairPoorFair10031.5
April 1997PoorFairPoorFair10031.5
April 1996PoorSeriousPoorPoor10018.6
December 1993PoorSeriousPoorPoor10019.5
March 1992PoorSeriousPoorPoor10019.5
January 1991PoorSeriousPoorFair10019.5