ON TSR 328 over SPRING RUN

Map

Coordinates:
+40.51586, -77.75597
40°30'57" N, 77°45'21" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:ON TSR 328 over SPRING RUN
Structure number:000000000026592
Old structure number:444013002600000 (from 1992 edition)
Location:1 MI NW MCVEYTOWN
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:22.0 ft. [6.7 m]
Total length:25.9 ft. [7.9 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:27.9 ft. [8.5 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1950
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Concrete [1]
Main span design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: June 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:913 [as of 2016]
Truck traffic:3% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:68.1
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$295,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
June 2016FairSatisfactoryFairSatisfactory91368.1
June 2014FairSatisfactoryFairSatisfactory51974.5
June 2012FairSatisfactoryFairFair53274.5
June 2010FairSatisfactoryFairFair108867.9
June 2008FairSatisfactoryFairFair108567.9
June 2006FairSatisfactoryFairFair106968.0
June 2004FairSatisfactoryFairFair194967.1
June 2002FairSatisfactoryFairFair188667.2
June 2000FairSatisfactoryFairFair80768.2
August 1998FairSatisfactoryFairFair79168.2
August 1996FairSatisfactoryFairFair74474.3
August 1994FairSatisfactoryFairSatisfactory71873.3
August 1992FairSatisfactoryFairGood70873.3
August 1990FairSatisfactoryFairGood68773.4

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Reinforced Concrete Girder/Beamlinear ft.1421270150
Deck
Reinforced Concrete Decksq. ft.701694700
Wearing Surfacessq. ft.620620000
Substructure
Reinforced Concrete Abutmentlinear ft.8987200
Bearings
Enclosed/Concealed Bearingeach1212000
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.5151000