SR 3003=8TH STREET over BUFFALO CREEK
Map
Coordinates:
+40.92361, -77.0534440°55'25" N, 77°03'12" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | SR 3003=8TH STREET over BUFFALO CREEK |
Structure number: | 000000000033550 |
Old structure number: | 593003020000000 (from 1992 edition) |
Location: | BORO OF MIFFLINBURG |
Purpose: | Carries highway over waterway |
Route classification: | Minor Collector (Rural) [08] |
Length of largest span: | 73.2 ft. [22.3 m] |
Total length: | 77.1 ft. [23.5 m] |
Roadway width between curbs: | 17.1 ft. [5.2 m] |
Deck width edge-to-edge: | 20.0 ft. [6.1 m] |
Owner: | State Highway Agency [01] |
Year built: | 1940 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Main span material: | Steel [3] |
Main span design: | Stringer/Multi-beam or girder [02] |
Deck type: | Wood or Timber [8] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: May 2018
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 1,252 [as of 2018] |
Truck traffic: | 4% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Fair [5 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Roadway alignment appraisal: | Better than present minimum criteria [7] |
Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4] |
Sufficiency rating: | 76.0 |
Recommended work: | Other structural work, including hydraulic replacements. [38] |
Estimated cost of work: | $373,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
May 2018 | Fair | Good | Fair | Fair | 1252 | 76.0 |
May 2016 | Fair | Good | Fair | Fair | 1248 | 76.0 |
May 2014 | Fair | Good | Fair | Fair | 1191 | 77.1 |
May 2012 | Fair | Good | Fair | Fair | 1220 | 77.1 |
May 2010 | Fair | Good | Fair | Fair | 1409 | 76.9 |
May 2008 | Fair | Good | Fair | Fair | 1405 | 76.9 |
May 2006 | Fair | Good | Fair | Fair | 1384 | 76.9 |
May 2004 | Fair | Good | Fair | Fair | 2119 | 70.2 |
May 2002 | Fair | Good | Fair | Fair | 2051 | 71.1 |
May 2000 | Fair | Satisfactory | Fair | Fair | 2489 | 69.8 |
May 1998 | Fair | Satisfactory | Fair | Fair | 2489 | 70.7 |
May 1996 | Fair | Satisfactory | Fair | Fair | 2045 | 68.8 |
May 1994 | Fair | Satisfactory | Satisfactory | Satisfactory | 1973 | 80.2 |
May 1992 | Fair | Satisfactory | Satisfactory | Satisfactory | 1946 | 82.5 |
May 1990 | Fair | Satisfactory | Satisfactory | Satisfactory | 1884 | 82.6 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Steel Girder/Beam | linear ft. | 436 | 366 | 50 | 20 | 0 |
Steel Protective Coating | sq. ft. | 10,753 | 10,753 | 0 | 0 | 0 |
Substructure |
Masonry Abutment | linear ft. | 77 | 47 | 20 | 10 | 0 |
Joints |
Assembly without Seal Joint | linear ft. | 20 | 0 | 0 | 0 | 20 |
Deck |
Timber Deck | sq. ft. | 1,293 | 0 | 1,293 | 0 | 0 |
Wearing Surfaces | sq. ft. | 1,293 | 1,293 | 0 | 0 | 0 |
Bearings |
Movable Bearing | each | 6 | 6 | 0 | 0 | 0 |
Steel Protective Coating | sq. ft. | 10,753 | 10,753 | 0 | 0 | 0 |
Fixed Bearing | each | 6 | 6 | 0 | 0 | 0 |
Steel Protective Coating | sq. ft. | 10,753 | 10,753 | 0 | 0 | 0 |
Bridge Rail |
Steel or Aluminum Bridge Rail | linear ft. | 153 | 143 | 10 | 0 | 0 |
Steel Protective Coating | sq. ft. | 10,753 | 10,753 | 0 | 0 | 0 |