BAILEY BRIDGE T686 over TENMILE CREEK

Map

Coordinates:
+40.02060, -80.19560
40°01'14" N, 80°11'44" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:BAILEY BRIDGE T686 over TENMILE CREEK
Structure number:000000000035242
Old structure number:627201068640480 (from 1992 edition)
Location:600' SOUTH OF SR 2020
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:35.1 ft. [10.7 m]
Total length:70.9 ft. [21.6 m]
Roadway width between curbs:14.1 ft. [4.3 m]
Deck width edge-to-edge:15.1 ft. [4.6 m]
Vertical clearance above deck:9.2 ft. [2.8 m]
Owner:County Highway Agency [02]
Year built:1887
Year reconstructed:2001
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:2
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

Latest Available Inspection: August 2017

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:10 [as of 2017]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Sufficiency rating:54.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$91,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
August 2017FairSatisfactoryGoodFair1054.2
August 2015FairSatisfactoryGoodFair1054.2
August 2013FairSatisfactoryGoodFair1055.0
August 2011FairSatisfactoryGoodFair1020.0
August 2009FairSatisfactoryGoodFair1020.0
June 2009FairSatisfactoryGoodSatisfactory1027.1
August 2007FairSatisfactoryGoodSatisfactory1027.1
August 2005FairSatisfactoryGoodSatisfactory1065.9
September 2003FairFairGoodSatisfactory1064.9
September 2001FairFairGoodSatisfactory1066.2
December 1999GoodGoodGoodGood1067.2
September 1997FairSatisfactorySatisfactoryGood1027.0
November 1995PoorSatisfactorySeriousGood1020.4
October 1993FairGoodSatisfactoryVery Good1028.8
October 1991FairGoodSatisfactoryVery Good1028.8