Share:

SPRING GARDEN E.B. over WEST RIVER DRIVE RAMP

Map 

Coordinates:
+39.96437, -75.18327
39°57'52" N, 75°10'60" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:SPRING GARDEN E.B. over WEST RIVER DRIVE RAMP
Structure number:000000000038973
Old structure number:673014004004500 (from 1992 edition)
Location:PHILA.ART MUSEUM 3590A06
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:71.9 ft. [21.9 m]
Total length:76.1 ft. [23.2 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:35.4 ft. [10.8 m]
Vertical clearance below bridge:12.5 ft. [3.8 m]
Skew angle:50°
Owner:State Highway Agency [01]
Year built:1965
Year reconstructed:1981
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: February 2016 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:6,121 [as of 2016]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Better than present minimum criteria [7]
Scour condition:Bridge not over waterway. [N]
Operating rating:105.8 tons [96.2 metric tons]
Inventory rating:62.9 tons [57.2 metric tons]
Sufficiency rating:71.6
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$205,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
February 201671.6FairSatisfactorySatisfactorySatisfactoryFO6121
February 201472.0FairSatisfactorySatisfactorySatisfactoryFO7712
February 201272.0FairSatisfactorySatisfactorySatisfactoryFO7794
March 201075.1FairSatisfactorySatisfactorySatisfactoryFO10785
March 200875.1FairSatisfactorySatisfactorySatisfactoryFO10761
April 200670.9FairGoodSatisfactorySatisfactoryFO10610
March 200472.1FairGoodSatisfactorySatisfactoryFO12704
March 200272.3FairGoodSatisfactorySatisfactoryFO12247
October 199971.8FairGoodGoodSatisfactoryFO5742
October 199770.8FairGoodGoodSatisfactoryFO8404