Name:ACCESS PR 181 & 30 over PR 30
Structure number:009742
Location:800 MTS S W OF GURABO
Purpose:Carries highway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:49.2 ft. [15.0 m]
Total length:171.9 ft. [52.4 m]
Roadway width between curbs:35.8 ft. [10.9 m]
Deck width edge-to-edge:40.7 ft. [12.4 m]
Vertical clearance below bridge:13.1 ft. [4.0 m]
Owner:State Highway Agency [01]
Year built:1968
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: February 2016

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:1,050 [as of 2005]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Better than present minimum criteria [7]
Underclearances appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge not over waterway. [N]
Sufficiency rating:79.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,092,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
February 2016FairSatisfactorySatisfactorySatisfactory105079.4
February 2014FairSatisfactorySatisfactorySatisfactory105080.1
March 2012FairSatisfactorySatisfactorySatisfactory105079.4
April 2010FairSatisfactoryFairSatisfactory105069.4
June 2008FairSatisfactorySatisfactorySatisfactory105076.4
November 2006FairSatisfactorySatisfactorySatisfactory105091.0
August 2004FairSatisfactorySatisfactorySatisfactory105091.0
May 2002FairSatisfactorySatisfactorySatisfactory105091.0
November 2000FairSatisfactorySatisfactorySatisfactory55093.0
April 1998FairSatisfactorySatisfactorySatisfactory105090.9
February 1996FairSatisfactorySatisfactorySatisfactory300088.8
November 1991FairFairFairFair200076.8

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Reinforced Concrete Girder/Beamlinear ft.8638531000
Deck
Reinforced Concrete Decksq. ft.6,9751,3242,4223,2290
Substructure
Reinforced Concrete Columneach99000
Reinforced Concrete Abutmentlinear ft.9595000
Reinforced Concrete Pier Caplinear ft.125125000
Joints
Strip Seal Jointlinear ft.82049330
Bearings
Fixed Bearingeach1515000
Bridge Rail
Other Material Bridge Raillinear ft.3513351600